The switches automatically limit the crane movement. For the travelling group, it stops the travelling before it reaches the buffers at the end of the rail. Rather than the factory settings, these switches should be readjusted according to the state of the movement area when the system is activated in the field. It operates in two stages with the logic of slow and stop.